Engineering Tower Chilled Water Shutdown 2/2/21

Date(s): February 2, 2021 from 6 - 10am

Purpose:

Services Affected:

On 2/2/21 from 6 AM - 10 AM, the chilled water at Engineering Tower will be shut down in service of an HVAC project in the building. During that time, the CS1 Core Site (ICS) will not have any cooling available, so we will have FM deliver and install a Movin-cool unit to ensure the room is cooled during the work. Once the work is done, cooling should function normally once more.

A network field technician will be onsite at 5:30 AM to ensure that the cooling unit is installed correctly prior to the shutdown.

If you have any questions or concerns, please call Alex Giesler at 949-824-9494.

Service Maintenance Status: Resolved