High Bay Concrete Cutting 1/14/20

Date(s): January 14, 2020 from 9am - 4pm

Purpose:

Services Affected:

Facilities management has informed us that on 1/14/20, the construction crew working on the high bay in Engineering Gateway will start around 9 - 10 AM to break the old concrete floor out to prepare for pouring new concrete. They will start on the concrete near the wall shared with Lab C and Network room of OITDC and work their way outward toward the main roll-up door entrance. They should finish by the end of the work day.

There is a possibility that this work send vibrations into Lab C and the Network room that could potentially damage equipment; though we have no ability to stop the work, we are taking precautions to limit this possibility and will be monitoring the vibrations at the start of the work.

If you have any questions, please contact Alex Giesler at ext 4-9494 or Ken Cooper at ext 4-3704.

Service Maintenance Status: Resolved

Resolution: