HIMaC Construction: Concrete Drilling Above OITDC

Date(s): June 22 - 23, 2020 from 6 - 2:30pm each day

Purpose:

Services Affected:

On 6/22 and 6/23, CDG construction will be working on prepping and drilling the concrete under a window on the second floor of Engineering Gateway; this window is directly above a section of OITDC, an area in Lab C. The work will start around 6 AM and finish by 2:30 each day.
Based on the success of previous (and more intensive) work from this group, there should be no problematic vibrations that reach our area. However, we'll be taking vibration readings throughout the morning to ensure no dangerous vibrations are detected that could harm equipment.

Please contact Alex Giesler at 949-824-9494 or Ken Cooper at 949-824-3704 if you have any questions or concerns.

Service Maintenance Status: Resolved