ICS Core Site Emergency Power Outage

Date(s): March 6, 2021 from 6 - 10am

Purpose:

Services Affected:

On Saturday 3/6/21, FM and Pacific Industrial Electric will be tying in a new connection from the new Engineering Tower ATS to the building generator. To do this safely, they must shut off Emergency power at 6 AM for 2-4 hours, which means the power supplying the CS1 Core site UPS will be down during that period. Most of the network and OIT equipment in the room has dual power sources, so no major outages should be expected for these devices. There are a select few devices that must be moved to campus/conventional power for the duration of the work, and a mitigation plan has been developed with NetOps to this end. Once the work is complete, Emergency power will be restored and normal operation will resume.

If you have any questions please contact Alex Giesler at 949-824-9494.

Service Maintenance Status: Resolved

Resolution:

« View All Planned Maintenance Announcements