Resnet Upgrade in Palo Verde and Verano Place

Date(s): Wednesday, December 19, 2018 to Thursday, December 20, 2018 from 9AM to 4PM

Purpose: Planned Maintenance

Services Affected:

On Wednesday, December 19th and Thursday, December 20th, OIT will be replacing several pieces of wired network equipment installed in Verano Place and Palo Verde. This is the conclusion of Housing's Major Maintenance refresh of ResNet's switch infrastructure. As part of this upgrade process, each apartment building will experience brief network outages as links are migrated to the new equipment. Below is the proposed timeline for the project:

-Wednesday, December 19, 9AM-12PM -- Verano Place 6200-6528
-Wednesday, December 19, 1PM-4PM -- Verano Place 100-3400
-Thursday, December 20, 9AM-12PM -- Palo Verde
-Thursday, December 20, 1PM-4PM -- Verano Place 66000-69000

We have allotted a 3-hour maintenance window for each section of grad housing, but the outages themselves will not be nearly that long. We anticipate that each building will experience two different minute-long service interruptions, and those one-minute outages will occur sometime within that 3-hour window.