1. Home
  2.  → 
  3. OIT Status Dashboard
  4.  → OIT Planned Maintenance

OIT Planned Maintenance

The following OIT services have planned downtimes or maintenance scheduled.

Network Maintenance at the Gavin Herbert Eye Institute

Scheduled for: Saturday, Apr 20, 2024 at 9:00 AM to Saturday, Apr 20, 2024 at 1:00 PM

Details:

The Network and Telecommunication Field teams will conduct scheduled maintenance at the Gavin Herbert Eye Institute, 1st Floor, on 4/20/2024 between 9 AM – 1 PM.

Please note that during this period, people on the first floors may experience intermittent loss of wired network connectivity. The planned cable maintenance is labor-intensive, requiring removal and a re-run of all the existing cross-connects. As a result, clients may experience brief outages throughout the window, affecting wired network access.

Back to Calendar View

Page updated on:
May 10, 2024